top of page
Untitled design-3.png
The CIPP Lining system is designed for 4″ – 8″ pipe diameters. The system can be installed through clean-outs or open end pipes. Only one access point is required. The liner can be ambient cured in 3 hours. 4″ diameter pipes can be rehabilitated up to 120FT+ in length, while 5″ to 8″ diameter pipes can be rehabilitated up to 180FT in length. 
Untitled design-6_edited.png
Untitled design-6_edited.png
Untitled design-6_edited.png
Untitled design-6_edited.png
Untitled design-6_edited.png

No Digging
No Mess 
No Hassle 
Lifetime Warranty
1-Day Installation

AFTER-SEWER-LATERAL-REPAIR-PERMA-LATERAL.jpg
bottom of page